More Theming has now been added to the top of the roof
A new better quality liner is being laid
Maintenance work to the flume continues
The log flume path is now complete
The new roof on the station is very nearly complete
The log flume lake continues to be landscaped
A very different shape is forming
More maintenance work on the flume
the old log photo kiosk sign
The photo kiosk has been stripped down to its frame
A close up of the shower head theming on the station roof
The control booth appears to have had a revamp
Bubble theming next to the station
A picture from inside the log flume tunnel, not much happening in here
A close up of the tap theming on the station roof
February 15th 2004
More tiles have been placed since the last update
The lake still has no water in - landscaping taking place
Work continues placing the tough blue lining in the trough
Final section of the ride
The entrance to the viewing platform and entrance/exit area
Looking down the queue line - the old queue line signs still present
Theming begins inside the station, with big white bubbles hanging from the roof. The structure has been sprayed gold and the operators cabin re-painted and tiled.
Footers have been laid for a new building, possibly a photo shop
March 16th 2004
The roof of the main station is now looking complete