Constructed over the 1985/86 closed season, the Congo River Rapids required large quantities of rock to be blasted from the site. The ride, located on what was formerly a coach park, consists of a trench nearly half a mile long!

h

Here you can see how deep the trench is at points.

h

John Broome (left) inspects the construction site along with Michael A. Jenkins.

h

The Rapids trench under construction.

h

A view from above of a portion of the Rapids’ trench.